Showing posts with label DIY. Show all posts
Showing posts with label DIY. Show all posts

Sunday, June 7, 2015

DIY - Kitchen Backsplash Complete!

Hi everyone!! Well, after quite the hiatus (nearly a year!), rustyfarmhouse is back and better than ever! It was sad putting the rustyfarmhouse blog to the side for a bit, but after having Walden I realized that having a very young baby around isn't conducive to starting house projects. Or frankly any kind of house work - and that definitely includes cleaning, ha!

Walden is a bit older now (he turned 1 on Mother's Day) and now that he's crawling about I really wanted to address our floor situation. Looking at the floors was the poison ivy I needed to get the project itches going again. Clint also took several business trips and I found that dreaming up new house projects was a really fun way to pass my lonely nights.  :)

The floors, however, were a big project that definitely required discussion with Clint, so before tackling the floors I spent a lot of time thinking about the kitchen. Truth be told, we are lucky to have a really great kitchen with custom cabinetry and amazing appliances. The previous owner of the farmhouse put a pretty penny into renovating the kitchen, and it was definitely one of the things I was most drawn to in the house.

That being said, however, the kitchen isn't perfect (for me) aesthetically. If you read some of the early rustyfarmhouse posts, you know that the kitchen used to be a terrible dirty yellow color that made the blue island look hideous with the red oak cabinets. This prompted me to paint the kitchen blue, and that definitely helped the island settle into the space. After that we threw some stuff up on the walls and called it a day. Here it was:


Recently, however, after looking at the inspiration photos for other kitchen renovations, I decided it was time to take our kitchen to the next level.  All the bones are there, it just needs a bit of sprucing up. The first thing I decided to do was to add a backsplash.

Originally I'd be dreaming of doing a whitewashed brick backsplash around the stove and vent hood, because I just love love loooooooove the way brick looks. I've been obsessed with brick ever since I put this brick backsplash up in my Baltimore condo:


Seriously - how cool is that brick?? But when I thought about it, I decided that whitewashed brick is probably NOT easy to clean and splatter marks would show up very easily. It wasn't a problem on the dark brick as much because I figured if you couldn't clean it perfectly, you probably weren't going to see it anyways. (Is that terrible??) So in the end I decided to go with a white subway tile, which I think still fits the farmhouse motif but is much cheaper, much easier to clean and MUCH MUCH easier to install than brick.  :)

I spent a good couple of weeks just debating *where* to put the backsplash. Originally I just planned to put something up over the stove and around the vent hood, but eventually decided to tile the entire area above the countertops. Why settle for less work when you can do more?!? So the first thing we did was pull everything off the walls, including the vent hood because I didn't really want to bother cutting tile around it. This also gave me a good opportunity to clean it thoroughly, which it desperately needed.


This was actually my very first tiling project, and I was fortunate to get some guidance and help from my father-in-law Tom. He showed me how to put the tile up and helped with the grouting. Fortunately the subway tiles are self spacing, so that saved a lot of time once I got my initial row in and level.


You never really realize JUST how crooked and curvy your walls are until you put tile up. You can see in the corner that the wall on the right actually curves into the room as it goes up, What is up with that? Ah well, just one of the joys of living in a 104 year old house.


But when all's said and done, I think the kitchen looks fabulous - crooked, curvy walls and all. I went with "Platinum" grout, which looked to be a very light almost metallic grey, but it's actually so close to the color of the walls that it matches the blue perfectly.


And here is the final product in natural light! (Please pardon the mess).




The white tile really brightens up the space, making it feel fresh and clean. Although it may not make a huge difference in the pictures, it looked even better after we got the electrical face plates and caulk in as well.


I'm really happy with the way the backsplash turned out, and I think it sets the stage for the rest of the completed and upcoming kitchen changes. So far I've added open cabinets on both sides of the vent hood, and plan to add some floating shelves on the walls around the windows. Lastly, I plan to paint the cabinets (except for the island) white, because I just think a farmhouse kitchen should be white. I'm hoping that the white cabinetry will really make the kitchen feel even brighter and larger, and will compliment our beautiful new (antique pine) flooring better than the oak. I'm very excited to post about all of these kitchen changes and the new floors in the near future!


Tuesday, July 1, 2014

DIY - Bathroom Completed!

    Ahhh!  Our bathroom is finally complete!  Okay, mostly complete... we still need to add the vent/exhaust fan + light and paint the ceiling, but really for all intents and purposes, the bathroom is done!  It's actually been done for quite some time - just over 2 months as we finished a couple weeks before Walden was born.  But, adjusting to life with a baby has sucked up nearly all of my blog-posting time.  :)

     I am really happy with how the bathroom turned out.  It's so different I can barely remember what it looked like before without the pictures!  We lost a linen closet in the renovation but gained the refinished double-sized vanity (with one really large sink), a beautiful clawfoot tub, tile instead of linoleum, a new toilet, amazing fixtures and a really nice black, white and purple color scheme.  Here's a quick look at the before and after! 


     Here's the finished vanity complete with the anthropologie mercury glass candles that were the inspiration for the mercury glass sconces.  We put a three-pronged antique style cast-iron hook on the wall for hand towels.



     I also found this cute toilet paper holder.  It's not an antique, but it's a nice reproduction.


     Our built-in shelf turned out wonderfully.  We added two more of the cast iron hooks by the back of the tub for easy towel access post-shower.  


     I really love the hardware and shower conversion kit that we chose for the clawfoot tub.  The tub faucet matches the sink faucet perfectly and adding a shower to the tub was a must.  I'd heard that showering in a clawfoot tub was really inconvenient, but I was actually pleasantly surprised by how not-bad it was!  The hardest part is getting into the tub because it's quite a bit taller than a conventional bathtub.  Other than that, I barely notice a difference.  I did have to buy 3 shower curtains to fit around the full length of the tub, but I used my sewing machine to shorten them lengthwise and convert them into 2 extra wide curtains.  For the back curtain, I sewed in an overlapped opening so we would have easy access to the toiletry shelf without flooding the back wall with shower water.


     Lastly, even though we got the tub standing on its feet and it seemed very secure, Clint didn't want to risk the tub falling and busting the pipes/tile/etc.  It would pretty much ruin the bathroom if anything went awry, so we built little wooden support stands to go under the tub.  They sit about 1/8th of an inch below the height of the tub so that if the tub were to fall, it would be just barely. I was really concerned about adding something that would look terrible, but they're nearly invisible if you're not looking for them and gave us some peace of mind.


     That's it!  It was a lot of hard work and it took forever (from November until April, working mainly on weekends), but it was definitely worth it.  And although I spent way way way too much time picking out every little detail for the bathroom, I really enjoyed my little venture into the world of interior design!  That being said, I wouldn't recommend anyone take on a bathroom renovation project at ~3 months pregnant...  :)





Friday, March 28, 2014

Bathroom Updates - Tile, Toilet, Mirror, Lights and Vanity!

     Thanks to a lovely mid-March snow-day induced 3-day weekend, the bathroom has come a long way since the March 1 update!  I mean, ITS PRACTICALLY ALMOST DONE!  It's not really done - there's no bathtub - but seriously, it's practically like a real bathroom now! And most importantly - it has a toilet!  Which means I don't have to run downstairs at 2, 3, 4 or 5 in the morning to pee. :) Yay! It was a lot of hard work, but totally worth it!

     After getting the wonderboard in and priming the walls for paint, it was time to start tiling the floor.  We weren't really looking forward to this because we chose admittedly difficult tile to work with - the tiles are a mosaic lantern pattern, and each tile is approx 2"x3".  We started by laying our initial straight line (which is hard when there isn't a straight line in your bathroom, period, haha), and then worked out from there.  Clint dedicatedly laid thinset, and I laid the tile behind him.  Though seemingly harmless, this was a little tiring at this stage of my pregnancy. And then I was (stupidly) laying tile while moving in a backwards direction and I managed to squarely step into the open vent hole on the bathroom floor.  My leg fell in and got scraped from my foot to my knee... and I tweaked my preggo back... and I'm lucky that there's a drop ceiling in the kitchen below the bathroom and I didn't poke my foot or the vent shaft through the kitchen ceiling!  :)  Other than that the process went pretty well.  


  

     The next step on the checklist was getting paint on those walls.  Unfortunately it's been tough to get a good picture that really captures the colors well between the never ending gray weather and the unnatural lighting - but I tried.  The lighter wall is called 'lavender heather' and the darker wall is dark purple with the faux brushed pearl effect.  I was afraid that the faux effect would be really difficult and time consuming, but it wasn't that bad!


 

     The following day we finally grouted the tile. And by we, I mean Clint and his brother Erin.  So I'm not really sure how tough the grouting process was, but I'm sure it was arduous.  It was also really messy since we decided to use a black grout to really accentuate the shape of the tile.  A bit after the initial grouting was done, Clint and I had to go up and buff the tiles and clean them up.  !!THAT WAS HELL!!  I think we waited a touch too long and the grout wasn't coming off very easily.  We had to hard-scrub every curvy grout-line, for hundreds of tiles.  We literally spent hours doing this.  So the moral of the story is - if you want to make your bathroom tiling experience way more time consuming and difficult than it can be, choose a curvy white mosaic tile and pair it with black grout.  :)  But at the end of the day, I love the way the tile looks, so again, totally worth it.

     After the paint and tile went in, we could actually begin to install some of the bathroom elements!  This was the part I was most excited for because I spent days and days looking at thousands of sinks, faucets, lights, dressers, tiles, mirrors, etc. trying to find elements that would match my vision for the bathroom.  (If you know me, you probably know that I'm very particular...)  So while I was excited, I was also nervous because it's hard to imagine what things will look like before they're actually installed.  Would I love it or would I hate it?!?!  Fortunately, I'm super excited and really pleased with the way things are shaping up so far! 

     With the help of Clint's Dad, the first elements to go in were the wall faucet and the light fixtures.  I absolutely love the antique look of the chrome elephant nose faucet - and the cross-bar handles are nearly a perfect match to the set on the tub.  I debated heavily about if we should use these Pottery Barn sconces because they weren't chrome (and pretty much all of our other fixtures are chrome), but I figured at least the bases are black, which should match our vanity top, and the shiny metallic mercury glass had a bit of a chrome feel to it as well.

   

     Next up was the toilet, mirror and vanity.  For as much as I tried to save money in this reno, there were certain elements I couldn't find "cheap" and didn't want to compromise on.  So, our toilet is a really pretty and slightly antique-y looking Kohler, and the mirror also came from Pottery Barn.  I actually had a hard time finding a large mirror that was wide enough, but narrow enough to fit between the vanity and our short ceiling.  

    I wasn't savvy enough to take any photos of the toilet with the seat down - but if you could see the tank, you'd see that it has a nice rectangular shape, and the front bows out - which matches the shape of the vanity and also draws in the curves of the tile.  (I'll make sure the seat is down for the completion post!)  So here's everything that we have currently installed!



     You may remember that the sink was a vessel sink, and I was contemplating dropping it into the vanity.  As you can see, we did just that.  We found that there wasn't a ton of space between the faucet and the sink, so the extra 1-2 inches gained made a big difference in the usability of the faucet.  :)  I also think that dropping the sink into the vanity gave it a more seamless look.  The size and shape of the sink ended up fitting the vanity perfectly!


     And here is one last picture of the space in 'natural' morning lighting.  I really love the way the light lavender draws out the brushed pearl element on the darker purple wall, and I'm really pleased with the way the purples coordinate with our 'black and white' elements.


    
     Hopefully the next bathroom post will actually be our completion post!  We still need to grout the tile in the over-tub toiletry bump-in, and then we need to frame that up to match the window/door trim and add the baseboard.  Then we just need to install the tub and the shower enclosure.  And then we'll actually be done!  I hope it turns out well.  Stay tuned!




Saturday, March 1, 2014

Bathroom Renovation Updates

     It feels like we started the bathroom renovation FOREVER ago - and to be honest it kind of was forever ago.  The Bathroom Demolition Day post was from November 11 and now it's almost St. Patty's Day!  Progress has been a little slow - but that's what happens when you don't feel like working on the bathroom at night after work and when 1 half of the working couple is preggo.  :)[FWIW, Clint claims that it's very difficult to work on the bathroom after work when it's dark outside because of the poor lighting in the bathroom...]

     Nonetheless, I'm excited about the progress that has been made, and I think that the stuff left to be done may be easier, or go faster, or at least make us feel like we're making more progress than the stuff we've accomplished so far.  Which begs the question, what have we done so far??

     Well the first thing we had to do was finish the demo - which included stripping the last part of the floor to reach the subfloor and tearing down the built in bump out for the old shower.  We also had to pull up some of the subfloor around the plumbing for the old shower and the toilet, since the plumbing needed to be moved. Here's a photo of what the bathroom looked like in this state.  We used a big paper template of the clawfoot tub to get an idea of where the plumbing would need to be moved.



     Once all the plumbing was moved appropriately - we had to address the subfloor.  Apparently our 1911 house has settled considerably since being built, and there was a good 3-4 inch slope from the back of the bathroom to the front.  There was also some sloping from the outside wall to the inside wall.  Normally with small issues in leveling you can just use self-leveling cement, but these differences were a little too big for cement, so we needed to build a new and level subfloor.  After some debate we decided to build on top of the old subfloor instead of ripping it out and building up or down from the joists.  We lose a bit of height that way (which is unfortunate since our ceilings are so low), but it was a much simpler way to do things.
     
     Building the subfloor was a little bit time consuming, but fortunately not too difficult.  We employed many of the same techniques that we used to build level garden boxes on the sloped ground outside.  We started by laying a small (4x7) board of the new subfloor down at the highest point of the subfloor (the back wall seen in the photo), and jacking up the other side with shims until the new subfloor was level from the back to the front. Then when it was level, we measured that against a 2x4 that would become one of the "new" joists.  Then we cut the joists to replace the shims as the new leveler.  We did that across the length of the bathroom, putting new joists down on top of where all of the old joists were, and a few going the opposite direction for extra support.  Once we had all of the new joists in, we just had to secure the new subfloor onto the joists.




     Then, just when we thought we were done, Clint and his dad realized that the back wall was a bit of a false wall, and decided to tear it down to gain us some more space in the bathroom.  There was also some drain vent pipe that went through the exterior wall (which we've moved to go up and out through the attic now), but it left a hole in the wall of our bathroom, hehe. So this was our new (old) wall, and the new and exciting view from the bathroom. 



     Once the floor work was done, we also had to move the plumbing and electrical around in the walls to account for the changes we were making. We did just about all of the plumbing work ourselves, but Clint's dad was a great source of help for the electrical work. 

     For the remaining plumbing, we needed to move the drain pipes for the new vanity and bring the water pipes up through the wall since we're using a wall-mount faucet instead of a vanity-mounted faucet over the sink.  For the electrical, we added wiring for an exhaust fan since our bathroom didn't have one before, and split the electrical for the old vanity lights since we're going to use a pair of sconces in the new bathroom.  We added a GFI outlet and moved the previously installed one to fit with the new vanity.  We mounted everything in place where we would need them, and added some studs so that we could mount the mirror on studs instead of drywall.  Then the men added insulation to all the walls, and we built a recessed area in the back wall (the one with the hole) where we will hopefully be able to put our shower toiletries. 

     Finally we got to the point where all of the behind the scenes work was done (I thought I took some pictures of the bathroom at this stage - but I couldn't find any on the camera so you'll just have to imagine how great the bathroom looked when all of the plumbing, electrical and stud work was complete).  Clint's brother Erin came over to clean up some of the work in the bathroom and prepare the walls for drywall installation. That was a huge help. We decided to hire the drywall job out because when we did even that small amount of drywall work in the nursery it took weeks and weeks to get the mudding right (and we had to have Clint's brother come over and fix it)... These guys can complete the job in 2 days.  :) I think it's worth it to speed up completion of this bathroom.  I really need this bathroom to be done so we can finish the nursery before Walden arrives!!

     It's crazy the difference that just adding drywall makes to a space!  Suddenly, it almost looks like a real room instead of a disaster zone.  :)



     The mudding still needs to be sanded - but once that's done we'll be ready to prime and paint!  This weekend we're going to start tackling the floor - putting down wonder-board in preparation for tile.  Then once the tile is in and the walls are painted, we can actually start installing the important stuff like the TOILET, tub and vanity/sink!  YAY!!  I'm so excited and can't wait to see how all of the elements will look together when the bathroom is complete.


Tuesday, February 4, 2014

DIY - Repurposing a Buffet or Dresser as a Bathroom Vanity: Part 2

At long last I've finally finished 
the buffet to bathroom vanity conversion!  
Well, the painting part at least... I actually finished several weeks ago,  but I've been tired and lazy and am just now
getting around to posting it.  :)  But what better time
to get back to blogging than when you're home sick
...on your birthday...
(birthday fail!)

I'm pretty sure the last time we saw this buffet
(Part 1) it looked like this:


My initial plan was to go with a strong black top,
to counter the white and separate the white base from the
large white sink.  I got the Rustoleum Satin Black oil-based
enamel paint.  Why?  Mostly because it was one of the only
non-spray black paints that wasn't giant at my
local hardware store.

I started by painting the dresser hardware with this shiny
black paint.  You can see it really shines!


Then I moved on to painting the dresser.
At this point winter was really starting to kick in so
I had to move the painting project inside (the outside temps
were too cold for the paint to dry effectively).

Moving the project indoors was a huge pain - not only because
we don't have a TON of space to work with (you can see
that I'm in this narrow area of the mudroom) - but because
there are cats indoors.  3 of them.
3 hopelessly curious cats.

3 curious cats that decided to jump all over the top of my buffet post-painting, regardless of the barriers I tried to put up.
You can see the paw prints below.
Those pesky kittens...


So I redid it.
And redid it again.
And redid it like, 17 times.
Sanding and painting, sanding and painting.


You can see in the shiny glare that the finish 
wasn't even - I'm not sure if it was user error or the oil based paint or what, but for THE LIFE of me, I could not
get that topcoat to look good.

It was streaky, uneven and terrible.  
Stuff got stuck in the topcoat from pretty much everything I used to apply the paint - and I tried a lot of different things!  
I used a foam roller, a regular roller, a hand bristle brush and a foam brush (all several times) and not once did I get something  with which I was even remotely satisfied.
Perhaps the problem was me, but I'll never 
buy that paint again!!

The longer drying time of the enamel also gave the buffet
ample opportunity to collect as much dust and cat hair
as possible.  TERRIBLE.

So after days (weeks?) of frustration, I finally decided
to screw the oil-based paint, and grabbed some of the 
the tub remodel and decided to use that.

BEST. DECISION. EVER.
(after marrying Clint, of course)

This made the project 100 million billion times easier.
We moved the buffet into the bathroom that's getting renovated
so I could spray paint to my heart's desire without
worrying about the walls or the carpet or furniture,
and we could close the door to keep the kitties out.
I'm not sure why we didn't think of that earlier.

I also went over the hardware with the hammered paint to make sure it would match, since the hammered black isn't as
strong or shiny as the enamel oil paint.

I finished the painting in just a matter of hours.
Then Clint and I spent a few days going over white areas with about 3 coats of polyacrylic (since it doesn't yellow the way polyurethane does), and also went over the black 
top with about 4-5 coats of polyurethane.

Here's some shots of the nearly finished product.
I apologize about the color - it was a little dark without
lights and not much better with the lights. :/

~tada~


And here's just a couple shots with the huge sink.
I love how well the curve of the sink fits the buffet's shape.

Part of me wants to inset the sink since its a bit high and there's a convenient lip that we could drop into the top, but we haven't made a final decision on that yet.

natural light
overhead lighting
I'm pretty happy with the way it turned out - I think
it'll look great in our black and white bathroom.
What do you think?





Wednesday, December 4, 2013

DIY - Leveled Garden Boxes

     Well, now that summer is officially over... (and fall is too) I figured it was just about time to write up my belated garden box post!  

   Our garden boxes are amazing - all 6 of them.  Each box is 6x3 which gave us a lot of gardening real estate, but we managed to use all of it and are contemplating eventually adding 2 more boxes.  We could have made larger boxes but Clint read that if you get much larger than 6x3 you have to start adding support in the middle of the box because of the weight of the dirt, and that was extra work we didn't feel like worrying about.

Here's a sneak peak at the finished boxes:


     Don't they look great?!?  I've really gotta hand it to Clint - he did all of the research on making good garden boxes and did a majority of the work with help from me and his dad.  He found this great blog tutorial on making garden boxes on sloped ground: http://eartheasy.com/blog/2010/04/how-to-build-a-raised-garden-bed-on-sloping-uneven-ground/  But if you don't feel like going there, feel free to read on about how to make them.

     I can't tell how evident it is in the picture - but our yard slopes downward and toward the neighbor's house, so we had a lot of slope to work with.  I didn't even really realize how *much* the yard sloped until we were putting in these garden boxes and wanted to level them.  Fortunately it worked out really well and now we have these cute tiered garden boxes!

How to make the boxes:

1.  Have the right tools:
     Make sure you have a circular saw to cut the wood - there is a lot of cutting involved and you would not want to do it by hand. You'll also need 4 L-shaped brackets per box, a ton of 2.5" screws and a power drill.

2.  Choosing the wood:     
     Clint read that cedar was the best because it repels bugs and lasts a long time outdoors even without treatment, but we couldn't find any cedar wood.  Or maybe it was absurdly expensive.  So after some debate, we decided to go with pressure treated wood, but lined the boxes with plastic cover to prevent the chemicals in the pressure treated wood from seeping into our soil.  (Apparently the chemicals they put in it aren't supposed to be that bad for you anymore, but we figured better safe than sorry.)  You'll need a LOT of wood.  For each 6x3 box you'll need at least 18' for the frame, and up to 18' for the side boards, and ~3-6 more for the level supports depending on the slope of your ground.  Plan on purchasing ~40-42 feet of lumber per box.  The more boxes you make, the more likely you are able to reuse some of the cut wood for the sideboards, so the amount of wood per box gets reduced.

3.  Framing the boxes:
     For the initial box frame, we opted for 2x6s and used 6ft planks.  We used 3 6ft boards per box - cutting one in half for the short sides.  To make the frame, use a single L shaped bracket at each corner to shape the boxes into long rectangles and place them on the ground where you want them.
     One thing to note - since our ground isn't level, most of our boxes are well deeper than 6" post-leveling, but each box does have one corner/side that is only about 6" deep.  If you want your shortest corner/side to be deeper than 6" you could go with 2x8s or 2x10s for your frame.    


4.  Leveling the boxes:
     After making the frame of each box, the next step is to level. In order to level the boxes, work on one box at a time and level it specific to the ground below it.  This does mean that you can't move the box after you level it (unless the spot you're moving it to is exactly the same pitch/slope).
     Level the boxes by adjusting the 3 low corners of the box to the tallest corner.  Prop each low corner up with varying heights of scrap wood/items until all 4 sides of the box are level.


   When level is achieved, make 'leveling' support stands at each corner of the box and the middles of the long sides.  To do that, place one of the extra 2x6s into the ground vertically and against the inside of the box.  Kind of shove it into the ground so that it's perpendicular to the box top and leaves an imprint in the ground.  Then draw a line on this 2x6 along the top of the box frame, as a guide for cutting.  After cutting that stand to size, return to the frame and screw the stand into the inside of the frame, using your imprint for placement.  Start in the middle (where you don't have external supports you can knock out of place) and then work on the 4 corners.  On the corners, screw both sides of your box into the corner stands.  Even though one corner is sitting on the ground, make a stand for it anyways as it provides extra strength and support for the box.


5.  Making the sides of the boxes:
     After the boxes are all leveled with your support stands, you have to make sides for the boxes.  For four of our boxes the 2x6's we had were tall enough to fill the gap between the box frame and the ground.  However 2 of our boxes were on such a slope that we bought 2x8s (maybe 2x10s?) so that we could make the side out of a single layer of wood instead of two.
     To make the sides, you'll place your side board on the ground along the length of the side you want to fill, right up next to the frame of the box.  (I should have taken a picture of this, because that was a terrible explanation).  Then you can trace the bottom of the box frame (from the inside) to draw a line against your side board for cutting.  You will have to skip the spaces where your support stands are in the way, but you can fill them in with a straight edge afterward.
     After making your cut, your wood should fit pretty perfectly between the leveled frame and the ground.  We put the cut side on the ground for aesthetic reasons.  Then you can screw the sideboard to your support stands.  Voila!


    Not only do the boxes look great, but the tiers are so cute. Clint did a great job making sure all of the boxes were straight!


6.  Line the boxes:
     If you went with pressure treated wood, your last construction step would be to line the boxes with plastic if you're concerned about the chemicals.  Our plastic started to rip by the end of the summer, so I'd recommend a thick plastic as opposed to a thin one.  I think we used about 3mil plastic. Unfortunately I can't make a recommendation on thickness as ours tore, but if we make more boxes I'll update the post to reflect what we chose.


The finished product:

We added little stakes to use for bird netting,
in case small animals were a problem.

     And a cute picture of our helper Bizzy.  Can't forget her!